Postgraduate DiplomaEnergy and Networks Applications open

Postgraduate Diploma in PPAs, Auctions and Regulatory Risk Management

Online 800-hour Postgraduate Diploma in PPAs, Auctions and Regulatory Risk Management. 8 modules covering Royal Decree 960/2020 (Renewable Energy Economic Regime), Order TED/1161/2020 (REER auction timetable) and Advanced Excel. Assigned tutor and open enrolment.

Duration800 h
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma
Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Compare the support mechanisms for renewable energy.

02

Analyse the design of auctions and their key parameters.

03

Explain how the Renewable Energy Economic Regime works.

04

Build a bidding strategy for an auction.

05

Assess PPAs against regulated revenue schemes.

06

Identify sources of regulatory risk in renewable projects.

07

Propose instruments to manage and mitigate regulatory risk.

Profile

Who it's for

  • PPA origination analyst looking to specialise in PPAs, Auctions and Regulatory Risk Management.
  • Energy regulation specialist looking to specialise in PPAs, Auctions and Regulatory Risk Management.
  • Renewable auction manager looking to specialise in PPAs, Auctions and Regulatory Risk Management.
  • Energy price analyst looking to specialise in PPAs, Auctions and Regulatory Risk Management.
  • Commercial strategy consultant looking to specialise in PPAs, Auctions and Regulatory Risk Management.
  • Regulatory affairs manager looking to specialise in PPAs, Auctions and Regulatory Risk Management.
  • Graduates in engineering or science looking to enter renewable generation.
Standards & tools

What you'll work with

  • Royal Decree 960/2020 (Renewable Energy Economic Regime)
  • Order TED/1161/2020 (REER auction timetable)
  • Law 24/2013 (Electricity Sector)
  • Directive (EU) 2018/2001 (promotion of renewables, RED II)
  • Directive (EU) 2023/2413 (RED III)
  • Regulation (EU) 2024/1747 (reform of the electricity market design)
Syllabus

8 modules · 800 h

  1. 1.1Premiums, feed-in tariffs and feed-in premiums
  2. 1.2Specific remuneration regime in Spain
  3. 1.3Auctions as an allocation mechanism
  4. 1.4Contracts for difference
  5. 1.5Green certificates and quotas
  6. 1.6Historical evolution of support in Spain
  7. 1.7EU State aid guidelines
  8. 1.8EU electricity market reform of 2024
  9. 1.9International comparison
  10. 1.10Workshop: comparison of support mechanisms in five countries
  1. 2.1Auction theory applied to energy
  2. 2.2Sealed-bid and pay-as-bid auctions
  3. 2.3Marginal price auction
  4. 2.4Auctioned product: energy or capacity
  5. 2.5Reserve prices and confidentiality
  6. 2.6Qualification and guarantees
  7. 2.7Penalties for non-compliance
  8. 2.8Competition and collusion risks
  9. 2.9Technology-neutral versus technology-specific auctions
  10. 2.10Practice: simulation of a pay-as-bid auction
  1. 3.1Royal Decree 960/2020 on the REER
  2. 3.2Auction order and timetable
  3. 3.3Award price and market adjustment
  4. 3.4Market adjustment percentage
  5. 3.5Compliance milestones
  6. 3.6Results of Spanish auctions
  7. 3.7Lessons from undersubscribed auctions
  8. 3.8Storage and capacity auctions
  9. 3.9Auctions in other European countries
  10. 3.10Case study: analysis of the results of a REER auction
  1. 4.1Levelised cost and offer price
  2. 4.2Valuation of regulated revenue
  3. 4.3Risk of the merchant portion
  4. 4.4Bid optimisation
  5. 4.5Game theory and competitors
  6. 4.6Public information and estimates
  7. 4.7Project portfolio and bidding
  8. 4.8Decision whether to bid
  9. 4.9Guarantee management
  10. 4.10Laboratory: optimal bidding model for an auction
  1. 5.1Comparison of PPA and auction risks
  2. 5.2Combining auctions and PPAs
  3. 5.3Bankability of each scheme
  4. 5.4PPAs with the public sector
  5. 5.5Two-way contracts for difference
  6. 5.6Long-term contracting in the European reform
  7. 5.7Public and private counterparty risks
  8. 5.8Impact on the cost of capital
  9. 5.9Selecting the commercial strategy
  10. 5.10Practice: comparison of auction and PPA cash flows
  1. 6.1Concept of regulatory risk
  2. 6.2Retroactive changes and their impact
  3. 6.3Cases of remuneration cuts in Spain
  4. 6.4Arbitration under the Energy Charter Treaty
  5. 6.5Legal certainty and stability
  6. 6.6Emergency measures: price caps and levies
  7. 6.7Iberian mechanism of 2022
  8. 6.8Change-in-law risk in contracts
  9. 6.9Political risk insurance
  10. 6.10Case study: analysis of market intervention in 2022
  1. 7.1Identification of regulatory risks
  2. 7.2Quantification with scenarios
  3. 7.3Monitoring the regulatory agenda
  4. 7.4Participation in public consultations
  5. 7.5Contractual protection clauses
  6. 7.6Geographic diversification
  7. 7.7Communication with investors
  8. 7.8Regulatory risk map
  9. 7.9Early warning indicators
  10. 7.10Workshop: regulatory risk map for a renewables portfolio
  1. 8.1Description of the project or portfolio
  2. 8.2Analysis of the support framework
  3. 8.3Auction participation strategy
  4. 8.4Comparison with PPA alternatives
  5. 8.5Valuation model
  6. 8.6Regulatory risk assessment
  7. 8.7Mitigation plan
  8. 8.8Final recommendation
  9. 8.9Report and presentation
  10. 8.10Final review with the tutor
Methodology, software & labs

How you'll learn

100 % online training on the SEIUM campus, with downloadable material, recorded lectures and an assigned technical tutor. No fixed timetable: students progress at their own pace within the intake, which makes it possible to combine the course with work.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is Advanced Excel, Python (pandas), PLEXOS, @RISK, Aurora, in free, academic or evaluation versions. The exercises are based on real procedures for bidding models in renewable auctions, comparative valuation of PPAs and regulated revenues, and analysis of regulatory risk scenarios. Assessment is continuous, module by module, plus the final integrating project.

Accredited laboratories(EN ISO/IEC 17025) with a rotor rig, EMC/Lightning pre-compliance, HIL/SIL, vibration/acoustics.
Evidence-driven Master's Thesis:safety case, test plan, compliance dossier and operational limits.
Industry-led mentoring:lecturers with experience in training, , eVTOL/UAM and flight test.
Flexible format(hybrid/online), international cohorts and support from SEIUM Career Services.
Ethics and safety:an approach built on safety-by-design, cyber-OT, DIH and compliance as core pillars.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Description of the project or portfolio

Compare the support mechanisms for renewable energy.

Analysis of the support framework

Analyse the design of auctions and their key parameters.

Auction participation strategy

Explain how the Renewable Energy Economic Regime works.

Comparison with PPA alternatives

Build a bidding strategy for an auction.

Valuation model

Assess PPAs against regulated revenue schemes.

Career opportunities

Where this takes you

PPA origination analystEnergy regulation specialistRenewable auction managerEnergy price analystCommercial strategy consultantRegulatory affairs manager
Admissions & scholarships

Requirements

  • Prior technical training or professional experience in the sector. No university degree is required.
  • Internet connection and a computer capable of running the programme's software.
  • Sufficient level of Spanish to follow technical regulatory texts.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme comprises 800 hours in total, spread over 6 to 8 months. That is an average of 10 to 15 hours per week, compatible with a full-time job.

The course uses Advanced Excel, Python (pandas), PLEXOS, @RISK, Aurora. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.

An own diploma from SEIUM upon passing the continuous assessment and the integrating project. It is the Institute's own training, not an official qualification from the Ministry.

Yes. Modules passed in a course or postgraduate diploma in the same area are credited towards the advanced programme. Check the credit transfer policy when you enrol.

Postgraduate Diploma in PPAs, Auctions and Regulatory Risk ManagementEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.