Reduce homologation risk: we identify gaps before accredited lab testing (pre-compliance) or the notified body.
Accelerate validation: instrumented test benches, HIL/SIL/VIL, and track/water/wind campaigns with design-to-test planning.
Auditable evidence: reports with end-to-end traceability, uncertainty statements, data governance, and standard references.
Testing & Certification
- Pre-compliance EMC · HIL/SIL/VIL · Materials & NDT · Track/Water/Wind · Environmental & Durability Traceable data. Standardized procedures. Auditable reports.
,
Value proposition
First-time-right.
Number of non-conformities avoided.
Time-to-test.
Rework avoided.
Readiness for audit and/or type testing.
Note: We are pre-compliance/readiness. When formal EN 17025 accreditation or type certification is required, we prepare dossiers and coordinate the campaign with the relevant laboratory/accreditor
Standards and sectors (quick mapping)

Automotion
UNECE R10/R79/R100/…; ISO 26262/SOTIF; OEM specs.

Railway
EN 50121 (EMC), EN 50126/8/9 (RAMS), rolling stock requirements.

Aerospace
DO-160 (environmental/EMC), DO-178C/254 (software/hardware evidence), EN 9100.

Naval/Marine
IMO/IGF/IGC; classification societies (DNV/ABS/LR).

Energy/Networks
grid codes, power quality, HVDC/FACTS (component testing).

Off-Highway
IP, dust, severe vibration, ROPS/FOPS (pre-checked).
Capacity range (per test line)
Conducted/radiated emissions; immunity (EFT/ESD/surge/bursts); conducted immunity; radiated immunity.
Automotive/rail/marine harnesses; HV/LV in EVs; switching noise in power electronics; EMI in BMS/SiC/GaN.
Preparation for UNECE R10, IEC/CISPR, and sector-specific EN/ISO standards; troubleshooting with sniffers, ferrites, and PCB layout redesign (DfEMC-oriented).
Deliverables: test plan; limits & set-ups; scan maps; root-cause notes; mitigation recommendations; pre-compliance report.
SIL: plant models, fault injection, requirements coverage, continuous testing.
HIL: real ECUs, CAN/CAN-FD/FlexRay/Ethernet-TSN, restbus simulation, real-time constraints.
VIL: vehicle/mock-up with sensors (IMU, radar, LiDAR, cameras), closed-loop validation, and safety kernels.
Coverage for ISO 26262/SOTIF, UDS/OBD diagnostics, data logging, and requirements-to-test-to-evidence traceability.
Deliverables: test catalogue, traceability matrix, coverage report, fault campaign report, safety case evidence pack.
Mechanics: tension/compression/bending, fatigue, fracture, hardness.
Composites: lay-up, curing, void content, ILSS, impact (CAI).
NDT (pre-accreditation, EN 17025-ready): UT/PAUT, RT, ET, MT/PT, shearography (where applicable).
Surfaces and joints: adhesives, bonding, sealing, corrosion/SCC, salt spray, coatings.
Deliverables: coupon plan, batch records, uncertainty statements, S–N curves, and DfX recommendations (DfM/DfA/DfR).
Track: ride & handling, braking, tyre degradation, consumption/energy, thermal soak; telemetry and driver-in-the-loop.
Water: resistance/propulsion, manoeuvrability, seakeeping, cavitation (model/scale), onboard instrumentation.
Wind: wind tunnel (vehicle, hull, sail), aero styling, cooling airflows, brake cooling.
Correlation: CFD/FEA ↔ track/water/wind; DoE and model fit.
Deliverables: run plan, set-up sheets, V&V report, delta versus baseline, and sim-to-track/tank/wind correlation.
Climate: thermal cycling, humidity, thermal shock, salt fog.
Vibration/shock: sine/random sweeps, mission-based profiles, HALT/HASS.
Dust/water: IP testing (incl. IP6K9K), mud/spray, chemicals.
Endurance: lifetime test benches, derating, failure monitoring (RCM, condition monitoring).
Deliverables: load profiles, weak link analysis, lifetime extrapolation, and a reinforcement/design proposal.
GD&T, CMM, scan-to-CAD, surface roughness, ovality, roundness.
Sensor calibration (IMU, pressure, flow, thermocouples), uncertainty budgets, traceable certificates.
.
.
Process and SLA (from request to report)

Intake (48–72 h)
Scope, target standard, units under test, risks/safety, export/privacy restrictions.

Test plan (≤5 business days)
Procedures, setups, fixtures, acceptance criteria, data schema, safety plan.

Preparation (typically 1–2 weeks)
Fixtures, test scripts, calibrations, dry-run.

Execution (depending on complexity)
Safety, stop-the-line if risk appears; issue log and live notes

Preliminary report (≤5 days)
Findings, mitigation quick wins, preliminary pass/fail, delta vs. standard.

Final report and compliance binder (≤10 days)
Raw data, metadata, uncertainty, photos/setups, traceability, design recommendations, and next steps.

Readiness review (optional)
Pre-audit rehearsal — we simulate questions and evidence for the laboratory/accreditor.

Standard SLA
Previous deadlines + 30 days of post-test support (questions, quick test replication).
Security, data, IP, and compliance
- Security, data, IP, and compliance
- Data (GDPR): privacy-by-design, data minimization, segregated repositories, consent and minimum retention; audit log.
- Export controls (ITAR/EAR/dual-use): content classification, need-to-know, clean rooms, access logs.
- Intellectual property: background vs. foreground; licenses by field of use; publications with reasonable embargo and co-approval; sensitive material not for publication
Deliverables (what exactly you receive)
- Detailed test plan + safety plan.
- Data (raw and processed) with metadata, provenance, and data dictionary.
- Technical report with pass/fail, gaps, uncertainty, photos/setups, root cause, and mitigations.
- Compliance binder ready for audit/certification (standardized index, standard references, traceability matrix).
- Debrief session and actions (mitigation engineering, DfX, new campaign if applicable).
Modalities and frameworks for collaboration
KPIs and scorecard
- Quality: first-time-right, rework avoided, no gaps
- Deadline: time-to-test, time-to-report, time to design decision.
- Business: approval/certification milestones achieved, cost avoidance.
- Governance: SLAs met, issue log with no critical incidents, customer technical NPS.
- Delivery: quarterly dashboard + annual summary with recommendations.
Representative cases
- EMC EV Powertrain (SiC) Outcome: −40% radiated emissions after layout + shielding + grounding; pre-R10 validation in 2 iterations.
- HIL SDV/ADAS Outcome: 92% requirements coverage in 6 weeks; fault campaign with 0 critical regressions; safety case ready for audit.
- CAI & NDT composites Outcome: 12% increase in ILSS with refined cure profile; PAUT detected early disbonds → field failure avoided
- Track / Aero-Cooling Outcome: −8 °C in brake cooling with optimized ducting; sim-track correlation improved to 0.92.
Collaboration models and rates
- Per campaign (closed scope): ideal for pre-compliance
- Quarterly retainer: agile iterations (EMC/HIL) and fast-turn retests.
- Annual program: multi-line calendar (EMC + materials + track) with volume discount and priority SLA.
- Includes Compliance Annex (Ethics/IHL, export, GDPR) and Visibility Matrix if integrated with case studies or publications (subject to co-approval).
FAQs (selection)
Our reports are pre-compliance/readiness reports and speed up the process at the accredited laboratory. We prepare the binder and coordinate the formal campaign if you request it.
Yes. We design and validate specific fixtures, with documentation and maintenance.
Yes. NDAs, content classification, segregated repositories, clean rooms, and access logs.
Only non-sensitive data with co-approval. For sensitive results, we offer white-label or redacted summaries.
We coordinate logistics and local compliance; export/GDPR reviews and data agreements apply.
Next steps
- Tell us your target standard (e.g., UNECE R10, DO-160, EN 50121, OEM requirements).
- Receive a trial plan with timings, setups, and a rough budget.
- We ran the campaign and delivered a report and compliance binder, including a readiness review.