Testing & Certification

,

Value proposition

  • Reduce homologation risk: we identify gaps before accredited lab testing (pre-compliance) or the notified body.

  • Accelerate validation: instrumented test benches, HIL/SIL/VIL, and track/water/wind campaigns with design-to-test planning.

  • Auditable evidence: reports with end-to-end traceability, uncertainty statements, data governance, and standard references.

 
 
  • First-time-right.

  • Number of non-conformities avoided.

  • Time-to-test.

  • Rework avoided.

  • Readiness for audit and/or type testing.

 
 

Note: We are pre-compliance/readiness. When formal EN 17025 accreditation or type certification is required, we prepare dossiers and coordinate the campaign with the relevant laboratory/accreditor

Standards and sectors (quick mapping)

Automotion

UNECE R10/R79/R100/…; ISO 26262/SOTIF; OEM specs.

Railway

EN 50121 (EMC), EN 50126/8/9 (RAMS), rolling stock requirements.

Aerospace

DO-160 (environmental/EMC), DO-178C/254 (software/hardware evidence), EN 9100.

Naval/Marine

IMO/IGF/IGC; classification societies (DNV/ABS/LR).

Energy/Networks

grid codes, power quality, HVDC/FACTS (component testing).

Off-Highway

IP, dust, severe vibration, ROPS/FOPS (pre-checked).

Capacity range (per test line)

  • Conducted/radiated emissions; immunity (EFT/ESD/surge/bursts); conducted immunity; radiated immunity.

  • Automotive/rail/marine harnesses; HV/LV in EVs; switching noise in power electronics; EMI in BMS/SiC/GaN.

  • Preparation for UNECE R10, IEC/CISPR, and sector-specific EN/ISO standards; troubleshooting with sniffers, ferrites, and PCB layout redesign (DfEMC-oriented).

  • Deliverables: test plan; limits & set-ups; scan maps; root-cause notes; mitigation recommendations; pre-compliance report.

  • SIL: plant models, fault injection, requirements coverage, continuous testing.

  • HIL: real ECUs, CAN/CAN-FD/FlexRay/Ethernet-TSN, restbus simulation, real-time constraints.

  • VIL: vehicle/mock-up with sensors (IMU, radar, LiDAR, cameras), closed-loop validation, and safety kernels.

  • Coverage for ISO 26262/SOTIF, UDS/OBD diagnostics, data logging, and requirements-to-test-to-evidence traceability.

  • Deliverables: test catalogue, traceability matrix, coverage report, fault campaign report, safety case evidence pack.

  • Mechanics: tension/compression/bending, fatigue, fracture, hardness.

  • Composites: lay-up, curing, void content, ILSS, impact (CAI).

  • NDT (pre-accreditation, EN 17025-ready): UT/PAUT, RT, ET, MT/PT, shearography (where applicable).

  • Surfaces and joints: adhesives, bonding, sealing, corrosion/SCC, salt spray, coatings.

  • Deliverables: coupon plan, batch records, uncertainty statements, S–N curves, and DfX recommendations (DfM/DfA/DfR).

  • Track: ride & handling, braking, tyre degradation, consumption/energy, thermal soak; telemetry and driver-in-the-loop.

  • Water: resistance/propulsion, manoeuvrability, seakeeping, cavitation (model/scale), onboard instrumentation.

  • Wind: wind tunnel (vehicle, hull, sail), aero styling, cooling airflows, brake cooling.

  • Correlation: CFD/FEA ↔ track/water/wind; DoE and model fit.

  • Deliverables: run plan, set-up sheets, V&V report, delta versus baseline, and sim-to-track/tank/wind correlation.

  • Climate: thermal cycling, humidity, thermal shock, salt fog.

  • Vibration/shock: sine/random sweeps, mission-based profiles, HALT/HASS.

  • Dust/water: IP testing (incl. IP6K9K), mud/spray, chemicals.

  • Endurance: lifetime test benches, derating, failure monitoring (RCM, condition monitoring).

  • Deliverables: load profiles, weak link analysis, lifetime extrapolation, and a reinforcement/design proposal.

  • GD&T, CMM, scan-to-CAD, surface roughness, ovality, roundness.

  • Sensor calibration (IMU, pressure, flow, thermocouples), uncertainty budgets, traceable certificates.

.

.

https://seium.university/recruitment-services/

Process and SLA (from request to report)

Intake (48–72 h)

Scope, target standard, units under test, risks/safety, export/privacy restrictions.

Test plan (≤5 business days)

Procedures, setups, fixtures, acceptance criteria, data schema, safety plan.

Preparation (typically 1–2 weeks)

Fixtures, test scripts, calibrations, dry-run.

Execution (depending on complexity)

Safety, stop-the-line if risk appears; issue log and live notes

Preliminary report (≤5 days)

Findings, mitigation quick wins, preliminary pass/fail, delta vs. standard.

Final report and compliance binder (≤10 days)

Raw data, metadata, uncertainty, photos/setups, traceability, design recommendations, and next steps.

Readiness review (optional)

Pre-audit rehearsal — we simulate questions and evidence for the laboratory/accreditor.

Standard SLA

Previous deadlines + 30 days of post-test support (questions, quick test replication).

Security, data, IP, and compliance

Deliverables (what exactly you receive)

Modalities and frameworks for collaboration

FAQs (selection)

Our reports are pre-compliance/readiness reports and speed up the process at the accredited laboratory. We prepare the binder and coordinate the formal campaign if you request it.

Yes. We design and validate specific fixtures, with documentation and maintenance.

Yes. NDAs, content classification, segregated repositories, clean rooms, and access logs.

Only non-sensitive data with co-approval. For sensitive results, we offer white-label or redacted summaries.

We coordinate logistics and local compliance; export/GDPR reviews and data agreements apply.

Vida estudiantil

Next steps

Scroll to Top