Postgraduate DiplomaEnergy and Networks Applications open

Postgraduate Diploma in Interconnection and Substations for Hybrid Plants

Online 800-hour Postgraduate Diploma in Interconnection and Substations for Hybrid Plants. 8 modules covering Real Decreto 337/2014 (high-voltage installations), Real Decreto 223/2008 (high-voltage lines) and DIgSILENT PowerFactory. Assigned tutor and open enrolment.

Duration800 h
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma
Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Understand the grid connection requirements for hybrid plants.

02

Design step-up substations and their switchgear.

03

Carry out load flow, short-circuit and power quality studies.

04

Size the medium-voltage collector network.

05

Define the protection and control schemes of the substation.

06

Design overhead and underground evacuation lines.

07

Plan commissioning and compliance verification.

Profile

Who it's for

  • Substations engineer looking to specialise in Interconnection and Substations for Hybrid Plants.
  • High-voltage lines engineer looking to specialise in Interconnection and Substations for Hybrid Plants.
  • Electrical studies engineer looking to specialise in Interconnection and Substations for Hybrid Plants.
  • Protection engineer looking to specialise in Interconnection and Substations for Hybrid Plants.
  • Electrical site manager looking to specialise in Interconnection and Substations for Hybrid Plants.
  • Grid connection engineer looking to specialise in Interconnection and Substations for Hybrid Plants.
  • Engineering or science graduates looking to enter the renewable energy sector.
Standards & tools

What you'll work with

  • Real Decreto 337/2014 (high-voltage installations)
  • Real Decreto 223/2008 (high-voltage lines)
  • IEC 61936-1 (installations above 1 kV AC)
  • IEEE 80 (substation earthing)
  • IEC 62271 (high-voltage switchgear)
  • IEC 60076 (power transformers)
  • Regulation (EU) 2016/631 (RfG network code)
Syllabus

8 modules · 800 h

  1. 1.1Hybridisation at a single connection point
  2. 1.2Access capacity and capacity tender
  3. 1.3Hybridisation of existing installations under Spanish regulations
  4. 1.4Single-line diagrams of hybrid plants
  5. 1.5Installed capacity versus access capacity
  6. 1.6Injection limitation at the POI
  7. 1.7Revenue metering
  8. 1.8Requirements of the grid operator
  9. 1.9Wind-solar hybridisation case studies
  10. 1.10Workshop: reading the single-line diagram of a hybrid plant
  1. 2.1Busbar configurations
  2. 2.2AIS versus GIS substations
  3. 2.3Power transformers and their specifications
  4. 2.4IEC 60076 standards
  5. 2.5High-voltage switchgear
  6. 2.6Instrument transformers
  7. 2.7Auxiliary services
  8. 2.8Earthing grid design according to IEEE 80
  9. 2.9Civil works and layout
  10. 2.10Practical exercise: sizing the earthing grid of a substation
  1. 3.1Load flow at the connection point
  2. 3.2Short-circuit calculation according to IEC 60909
  3. 3.3Insulation coordination according to IEC 60071
  4. 3.4Harmonic studies and filters
  5. 3.5Dynamic stability studies
  6. 3.6Plant models for the operator
  7. 3.7Model validation
  8. 3.8Energisation studies
  9. 3.9Technical report for the grid operator
  10. 3.10Laboratory: short-circuit study in PowerFactory
  1. 4.1Radial and ring topologies
  2. 4.2MV cables and their sizing
  3. 4.3Losses in the collector network
  4. 4.4MV switchgear and transformer substations
  5. 4.5Neutral earthing
  6. 4.6Collector network protection
  7. 4.7Cables shared between technologies
  8. 4.8Route optimisation
  9. 4.9Standards applicable to the collector network
  10. 4.10Practical exercise: route optimisation of a collector network
  1. 5.1Substation protection scheme
  2. 5.2Transformer differential protection
  3. 5.3Distance protection of the evacuation line
  4. 5.4Interconnection protection
  5. 5.5IEC 61850 automation
  6. 5.6Hybrid plant controller (PPC)
  7. 5.7Active and reactive power control at the POI
  8. 5.8Remote control and communication with the operator
  9. 5.9Substation cybersecurity
  10. 5.10Case study: protection scheme of a hybrid substation
  1. 6.1Overhead versus underground lines
  2. 6.2High-voltage line regulations (RD 223/2008)
  3. 6.3Mechanical calculation of conductors
  4. 6.4Safety clearances
  5. 6.5Environmental impact and avifauna
  6. 6.6Lines shared between developers
  7. 6.7Easements and encumbrances
  8. 6.8Thermal capacity and dynamic line rating
  9. 6.9Line maintenance
  10. 6.10Practical exercise: mechanical calculation of a 132 kV line span
  1. 7.1Factory acceptance tests
  2. 7.2Substation commissioning tests
  3. 7.3Protection testing
  4. 7.4Operational connection notification
  5. 7.5Certification of generation modules
  6. 7.6Grid code compliance tests
  7. 7.7As-built documentation
  8. 7.8Handover to the operator
  9. 7.9Non-conformity management
  10. 7.10Case study: commissioning test plan
  1. 8.1Definition of the hybrid plant
  2. 8.2Access and connection strategy
  3. 8.3Single-line and substation design
  4. 8.4Electrical studies
  5. 8.5Collector network design
  6. 8.6Protection and control scheme
  7. 8.7Commissioning plan
  8. 8.8Budget and schedule
  9. 8.9Report and presentation
  10. 8.10Final review with the tutor
Methodology, software & labs

How you'll learn

100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: students progress at their own pace within the intake, which makes it possible to combine the programme with work.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is DIgSILENT PowerFactory, ETAP, PLS-CADD, CDEGS, AutoCAD, in free, academic or evaluation versions. Tests are studied on real procedures for load flow and short-circuit studies, earthing grid design and substation commissioning tests. Assessment is continuous by module plus the final integrating project.

Accreditable laboratories(EN ISO/IEC 17025) with a rotor test bench, EMC/Lightning pre-compliance, HIL/SIL, vibration/acoustics.
Evidence-oriented final project:safety case, test plan, compliance dossier and operational limits.
Industry mentoring:faculty with a track record in training, , eVTOL/UAM and flight test.
Flexible format(hybrid/online), international cohorts and support from SEIUM Career Services.
Ethics and safety:a safety-by-design approach, OT cybersecurity, DIH and compliance as core pillars.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Definition of the hybrid plant

Understand the grid connection requirements for hybrid plants.

Access and connection strategy

Design step-up substations and their switchgear.

Single-line and substation design

Carry out load flow, short-circuit and power quality studies.

Electrical studies

Size the medium-voltage collector network.

Collector network design

Define the protection and control schemes of the substation.

Career opportunities

Where this takes you

Substations engineerHigh-voltage lines engineerElectrical studies engineerProtection engineerElectrical site managerGrid connection engineer
Admissions & scholarships

Requirements

  • Prior technical training or professional experience in the sector. No university degree is required.
  • Internet connection and a computer capable of running the programme's software.
  • Sufficient Spanish to follow technical standards documentation.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme comprises 800 hours in total, spread over 6 to 8 months. That is between 10 and 15 hours per week on average, compatible with a full-time job.

You will work with DIgSILENT PowerFactory, ETAP, PLS-CADD, CDEGS and AutoCAD. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.

An SEIUM own diploma upon passing the continuous assessment and the integrating project. This is in-house training, not an official qualification from the Ministry.

Yes. Modules passed in a course or postgraduate diploma in the same area can be credited towards the advanced programme. Check the recognition policy when you enrol.

Postgraduate Diploma in Interconnection and Substations for Hybrid PlantsEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.