Master’s in Railway Electrification Engineering and Traction Substations
Online master's programme of 1,900 hours in railway electrification and traction substation engineering. 12 modules covering electrification systems, overhead contact lines, pantograph-catenary interaction, AC and DC traction substations, electrical simulation, return circuits and stray currents, EMC, energy efficiency, construction and maintenance, and standards and projects, with an assigned technical tutor.
Take the controls.
Run a real engineering trade-off from this programme. Move the sliders, watch the model react in real time and beat the challenge.
What you will be able to do
Select the appropriate electrification system for each line.
Design flexible and rigid overhead contact lines.
Assess pantograph-catenary interaction.
Size AC and DC traction substations.
Electrically simulate operations and their contingencies.
Control return circuits, earthing, stray currents and EMC.
Improve the energy efficiency of railway traction.
Who it's for
- Railway electrification engineers.
- Traction substation engineers.
- Catenary specialists.
- Energy simulation engineers.
- Electromagnetic compatibility engineers.
- Electrical installation maintenance managers.
- Engineering or science graduates seeking to move into the railway sector.
What you'll work with
- EN 50163 (supply voltages of traction systems)
- EN 50388-1 (power supply and rolling stock technical coordination)
- EN 50119 (overhead contact lines for electric traction)
- EN 50122-1 (electrical safety, earthing and the return circuit)
- EN 50121 series (railway electromagnetic compatibility)
- EN 50367 (pantograph-overhead line interaction criteria)
- EN 50318 (validation of simulation of pantograph-overhead line dynamic interaction)
- Regulation (EU) No 1301/2014 (ENE TSI) (technical specification for interoperability: energy)
- OpenPowerNet
- DIgSILENT PowerFactory
- ETAP
- MATLAB/Simulink
12 modules · 1900 h
1.1Direct current from 600 V to 3 kV1.225 kV 50 Hz alternating current1.315 kV 16.7 Hz systems1.42x25 kV system with autotransformers1.5Choosing the system by line type1.6Railway electrification in Spain1.7Energy interoperability: the ENE TSI1.8Regenerative braking and receptivity1.9Partial electrification and battery trains1.10Case study: comparison of systems for a regional line
2.1Flexible catenary configuration2.2Contact wire and its wear2.3Messenger wire and droppers2.4Cantilevers and registration arms2.5Mechanical tensioning and compensation2.6Catenary masts and foundations2.7Section insulators and neutral sections2.8Rigid overhead conductor rail in tunnels2.9High-speed catenary2.10Lab: catenary layout on a curve
3.1Types of railway pantographs3.2Mean contact force and standard deviation3.3Dynamics of the interaction3.4Simulation according to EN 503183.5Electric arcing and loss of contact3.6Wear of contact strips and wire3.7Compatibility according to EN 503673.8On-line interaction measurement3.9Multiple pantographs and spacing3.10Practical exercise: interaction simulation at 300 km/h
4.1Connection to the transmission grid4.2Traction transformers4.3High-voltage switchgear4.4Substation protection4.5Phase unbalance on the grid4.6Harmonics and power quality4.7Autotransformer stations4.8Substation earthing4.9Remote control and SCADA4.10Workshop: single-line diagram of a 2x25 kV substation
5.1Traction transformer-rectifier units5.212-pulse rectifiers and harmonics5.3Reversible substations with inverters5.4High-speed DC circuit breakers5.5Feeders and disconnectors5.6Short circuits in DC systems5.7Rail return in DC systems5.8Traction substations in metros5.9Power supply for tram networks5.10Case study: reversible substation on a metro line
6.1Electrical models of lines6.2Load flow with moving trains6.3Voltage drops and useful voltage6.4Sizing of substations6.5Energy consumption of operations6.6Thermal overloads of conductors6.7N-1 contingency scenarios6.8Simulation tools such as OpenPowerNet6.9Validation with real measurements6.10Lab: simulation of a 2x25 kV line
7.1Traction return circuit7.2Accessible touch voltages7.3Protection according to EN 50122-17.4Stray currents in DC systems7.5Corrosion of buried structures7.6Drainage and protection diodes7.7Measurement of stray currents7.8Earthing design7.9Interference with affected utilities7.10Practical exercise: touch voltage assessment at a station
8.1Railway electromagnetic compatibility8.2The EN 50121 series of standards8.3Interference with track circuits8.4Harmonics from rolling stock8.5Electromagnetic fields and exposure8.6Interference with telecommunications8.7Emission and immunity testing8.8Electromagnetic mitigation measures8.9Project EMC control plan8.10Case study: traction interference with a track circuit
9.1Making use of regenerative braking9.2Wayside and on-board storage9.3Eco-driving and ATO9.4On-board energy measurement according to EN 504639.5Procurement of traction energy9.6Integration of renewables into traction9.7Battery trains and charging9.8Hydrogen trains and their supply9.9Operational energy indicators9.10Workshop: estimating savings from energy storage
10.1Installation of catenary on site10.2Electrification machinery10.3Testing and acceptance of catenary10.4Energisation of installations10.5Preventive maintenance of catenary10.6Inspection with recording vehicles10.7Thermography of substations10.8Safety in electrical work10.9Isolations and lockout procedures10.10Lab: maintenance plan for a substation
11.1Requirements of the energy TSI11.2Supply voltages according to EN 5016311.3Technical coordination according to EN 5038811.4Catenary design according to EN 5011911.5Phases of an electrification project11.6EC verification of subsystems11.7Environmental impact of electrification11.8Electrification costs per kilometre11.9Tender specifications and procurement for electrification11.10Practical exercise: preliminary electrification design for a line
12.1Definition of the line to be electrified12.2Selection of the electrical system12.3Design of the overhead contact line12.4Electrical simulation of operations12.5Design of traction substations12.6Return circuit, earthing and compatibility12.7Energy efficiency strategy12.8Budget and construction phasing12.9Master's Thesis report12.10Master's Thesis: defence before a panel
How you'll learn
Training is 100% online on the SEIUM campus, with downloadable materials, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within each intake, so the programme fits around your work.
Each module combines theory, guided reading of the original standard and applied exercises. You work with OpenPowerNet, DIgSILENT PowerFactory, ETAP and MATLAB/Simulink, in free, academic or evaluation versions. Practical work is based on real procedures: electrical simulation of lines with real traffic, measurement of pantograph-catenary interaction, and assessment of touch voltages and stray currents. Assessment is continuous by module, plus the final Master's Thesis.
Standards covered: EN 50163, EN 50388-1, EN 50119, EN 50122-1, EN 50121 series, EN 50367, EN 50318, Regulation (EU) No 1301/2014 (ENE TSI).
Build it end to end
Your final project follows the real engineering workflow, step by step, reviewed by your tutor.
Where this takes you
Requirements
- A university degree in engineering, science or architecture, or equivalent demonstrable professional experience.
- An internet connection and a computer capable of running the programme's software.
- English sufficient to read technical standards.
Ready to start?
Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.
Frequently asked questions
The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.
You work with OpenPowerNet, DIgSILENT PowerFactory, ETAP and MATLAB/Simulink, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.
A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.
Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.
A degree in engineering, science or architecture (or equivalent professional experience), a computer able to run the software, and English sufficient to read technical standards.
Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.
Related programmes
Master’s in Social Impact Assessment and Citizen Participation Engineering
Online master's programme of 1,900 hours in social impact assessment and public participation engineering, with 12 modules covering social impact concepts, regulations and international standards, social…
Master’s in Track and Superstructure Engineering
Online master's programme of 1,900 hours in railway track and superstructure engineering. 12 modules covering the railway track, rail and welding, sleepers and fastenings, ballast and…
Master’s in Claims Management and Claims Analytics Engineering (SIU/Anti-Fraud)
Online master's programme of 1,900 hours in claims management and claims analytics engineering (SIU/anti-fraud): 12 modules covering technical claims handling, claims data, KPIs, predictive models, the…
More in Civil, Rail & Smart Cities
All Civil, Rail & Smart Cities programmes → · How to apply · Fees & financing · Scholarships