Master'sCivil, Rail & Smart Cities Applications open

Master’s in Intersection Design, Traffic Signalling and BRT Engineering

Online master's programme of 1,900 hours in intersection design, traffic signalling and BRT engineering, structured in 12 modules covering intersection geometry, roundabouts, signal timing, coordination and advanced control, BRT planning, corridor design and operation, road safety, signal equipment, simulation and construction, with the Highway Capacity Manual (HCM 7th ed.), Norma 8.1-IC and AutoCAD Civil 3D, and an assigned technical tutor.

Duration1900 h
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma
Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Design safe and efficient urban intersections.

02

Calculate traffic signal plans using recognised methods.

03

Coordinate intersections along arterials with specialist tools.

04

Plan BRT corridors in line with international standards.

05

Design stations and segregated bus lanes.

06

Assess alternatives through microsimulation.

07

Prepare detailed designs for intersections and corridors.

Profile

Who it's for

  • Traffic engineers.
  • Urban road infrastructure designers.
  • Traffic signalling specialists.
  • BRT system planners.
  • Road safety auditors.
  • Municipal highways technicians.
  • Engineering or science graduates aiming to work in local government.
Standards & tools

What you'll work with

  • Highway Capacity Manual (HCM 7th ed.) (capacity and level-of-service analysis)
  • Norma 8.1-IC (Spanish standard for vertical road signage)
  • Norma 8.2-IC (Spanish standard for road markings)
  • UNE 135401 (traffic controllers)
  • EN 12368 (traffic control equipment – signal heads)
  • Order TMA/851/2021 (accessibility in urbanised public spaces)
  • BRT Standard (ITDP, 2016) (international BRT scoring standard)
  • AutoCAD Civil 3D
  • PTV Vissim
  • LINSIG
  • TRANSYT
  • ARCADY (TRL Junctions)
Syllabus

12 modules · 1900 h

  1. 1.1Types: T-junctions, crossroads, roundabouts and interchanges
  2. 1.2Visibility and sight triangles
  3. 1.3Turning radii and design vehicles
  4. 1.4Turning lanes and storage lengths
  5. 1.5Channelising islands and pedestrian refuges
  6. 1.6Gradients, crossfall and drainage
  7. 1.7Intersections with tram and BRT
  8. 1.8Conflict points and their reduction
  9. 1.9Leading urban design guidelines
  10. 1.10Practical exercise: laying out an intersection with AutoCAD Civil 3D
  1. 2.1Roundabout capacity using empirical methods
  2. 2.2Geometric design of compact roundabouts
  3. 2.3Mini-roundabouts and turbo roundabouts
  4. 2.4Integrating pedestrian and cycle crossings
  5. 2.5Signalised roundabouts
  6. 2.6Road safety at roundabouts
  7. 2.7Public transport at roundabouts
  8. 2.8Signage and road markings
  9. 2.9Comparison with signalised intersections
  10. 2.10Lab: capacity analysis with ARCADY
  1. 3.1Stages, signal groups and diagrams
  2. 3.2Saturation flows and their measurement
  3. 3.3Webster's method for optimum cycle time
  4. 3.4Intergreen and clearance times
  5. 3.5Green split and degrees of saturation
  6. 3.6Delays and queues at intersections
  7. 3.7Pedestrian stages and crossing times
  8. 3.8Incompatibility matrices
  9. 3.9HCM calculation for intersections
  10. 3.10Practical exercise: signal plans for a four-arm intersection
  1. 4.1Arterial coordination and offsets
  2. 4.2Time–space progression diagrams
  3. 4.3Actuated control and associated detectors
  4. 4.4Real-time adaptive control
  5. 4.5Conditional signal priority for BRT
  6. 4.6Queue management and gating control
  7. 4.7Pedestrian detection systems
  8. 4.8Audible signals and accessibility
  9. 4.9Optimisation with LINSIG and TRANSYT
  10. 4.10Lab: coordinating a five-junction arterial
  1. 5.1Characteristics of BRT systems
  2. 5.2The ITDP BRT Standard and its scoring
  3. 5.3Demand and corridor selection
  4. 5.4Capacity of BRT corridors
  5. 5.5Trunk and feeder operation
  6. 5.6Experiences from Bogotá, Curitiba and elsewhere
  7. 5.7Comparison with tram and light rail
  8. 5.8Integration into the transport network
  9. 5.9Impact on urban development
  10. 5.10Case study: feasibility study for a BRT corridor
  1. 6.1Segregated lanes: median or kerbside location
  2. 6.2Stations: platforms, access and overtaking
  3. 6.3Intersection design along the corridor
  4. 6.4Pavements for bus lanes
  5. 6.5Depots and terminals
  6. 6.6Preventing lane intrusion
  7. 6.7Accessibility of stations and vehicles
  8. 6.8Landscaping and urban treatment
  9. 6.9Drainage and affected utilities
  10. 6.10Practical exercise: preliminary geometric design of a BRT station
  1. 7.1Articulated and bi-articulated vehicles
  2. 7.2Electrification of BRT fleets
  3. 7.3Scheduling express services
  4. 7.4Off-board fare collection
  5. 7.5Regularity and headway control
  6. 7.6Operations support systems
  7. 7.7Passenger information at stations
  8. 7.8Fleet and infrastructure maintenance
  9. 7.9Service quality indicators
  10. 7.10Case study: operating plan for a BRT line
  1. 8.1Collision analysis at junctions
  2. 8.2Road safety audits at design stage
  3. 8.3Speed management in urban environments
  4. 8.4Protection of vulnerable road users
  5. 8.5Left turns and pedestrian conflicts
  6. 8.6Intersection lighting
  7. 8.7Video-based conflict analysis
  8. 8.8Low-cost remedial measures
  9. 8.9Before-and-after evaluation of measures
  10. 8.10Workshop: safety audit of an intersection
  1. 9.1Controllers and their functions
  2. 9.2LED signal heads and optics
  3. 9.3Vehicle, bus and pedestrian detectors
  4. 9.4Push buttons and audible indicators
  5. 9.5Ducting and cabling
  6. 9.6Power supply and backup systems
  7. 9.7Communications with the control centre
  8. 9.8Commissioning tests
  9. 9.9Preventive maintenance of signal installations
  10. 9.10Practical exercise: technical specification for a signal installation
  1. 10.1Microsimulation of complex intersections
  2. 10.2Simulation of BRT corridors
  3. 10.3Calibration with real data
  4. 10.4Indicators: delays, queues and travel times
  5. 10.5Emissions and energy consumption
  6. 10.6Pedestrian simulation in stations
  7. 10.7Sensitivity analysis
  8. 10.8Presenting results to decision-makers
  9. 10.9Cost–benefit evaluation of alternatives
  10. 10.10Lab: simulation of a BRT corridor with signal priority
  1. 11.1Phases of the urban works project
  2. 11.2Quantities and budget
  3. 11.3Traffic diversions during construction
  4. 11.4Coordination with affected utilities
  5. 11.5Technical specifications
  6. 11.6Health and safety in road works
  7. 11.7Communication with residents and businesses
  8. 11.8Acceptance and commissioning
  9. 11.9Post-opening monitoring
  10. 11.10Case study: construction plan for a major junction
  1. 12.1Choice of the intervention area
  2. 12.2Traffic and safety diagnosis
  3. 12.3Geometric design of the proposal
  4. 12.4Signal calculation and coordination
  5. 12.5Design of a BRT corridor or station
  6. 12.6Simulation and comparison of alternatives
  7. 12.7Budget and construction phases
  8. 12.8Conclusions and recommendations
  9. 12.9Master's Thesis report
  10. 12.10Master's Thesis: defence before a panel
Methodology, software & labs

How you'll learn

The programme is delivered 100% online on the SEIUM campus, with downloadable materials, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within each intake, so the programme fits around your job.

Each module combines theory, guided reading of the original standards and applied exercises. The working software is AutoCAD Civil 3D, PTV Vissim, LINSIG, TRANSYT and ARCADY (TRL Junctions), in free, academic or evaluation versions. Practical work is based on real procedures: signal plan calculations at real intersections, microsimulation of bus corridors and road safety audits at junctions. Assessment is continuous, module by module, plus the final Master's Thesis.

Standards covered: Highway Capacity Manual (HCM 7th ed.), Norma 8.1-IC, Norma 8.2-IC, UNE 135401, EN 12368, Order TMA/851/2021, BRT Standard (ITDP, 2016).

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of the Highway Capacity Manual (HCM 7th ed.), Norma 8.1-IC and Norma 8.2-IC applied to real cases, not as a theoretical annex.
Industry software:AutoCAD Civil 3D, PTV Vissim, LINSIG, TRANSYT and ARCADY (TRL Junctions), in free, academic or evaluation versions.
Master's Thesis with defence:An intersection and BRT project covering diagnosis, geometric design, signal calculation, BRT corridor or station design, simulation and budget, defended before a panel.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Traffic and safety diagnosis
Choose the intervention area and diagnose its traffic and road safety.
Geometric design
Produce the geometric design of the proposal in AutoCAD Civil 3D.
Signal calculation
Calculate and coordinate the signal plans with LINSIG and TRANSYT.
BRT design and simulation
Design the BRT corridor or station and compare alternatives in PTV Vissim.
Master's Thesis
Integrate geometry, signalling, BRT design, simulation and budget into a complete project, defended before a panel.
Career opportunities

Where this takes you

Traffic engineerUrban road infrastructure designerTraffic signalling specialistBRT system plannerRoad safety auditorMunicipal highways technician
Admissions & scholarships

Requirements

  • University degree in engineering, science or architecture, or equivalent demonstrable professional experience.
  • Internet connection and a computer capable of running the programme's software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with AutoCAD Civil 3D, PTV Vissim, LINSIG, TRANSYT and ARCADY (TRL Junctions), using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.

A university degree in engineering, science or architecture (or equivalent professional experience), a computer able to run the software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Master’s in Intersection Design, Traffic Signalling and BRT EngineeringEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.