Master’s in Distribution Protection and Coordination Engineering
Online master's programme of 1,900 hours in distribution protection and coordination engineering. 12 modules covering short-circuit calculation, neutral earthing, instrument transformers, overcurrent and earth fault protection, auto-reclosing, distributed generation, LV protection, IEC 61850 digital protection, microgrids and relay testing, with an assigned technical tutor.
Take the controls.
Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.
What you will be able to do
Calculate short-circuit currents in distribution networks.
Analyse the behaviour of different neutral earthing systems.
Set overcurrent and earth fault protection.
Coordinate relays, fuses and reclosers.
Assess the impact of distributed generation on protection.
Design protection for microgrids.
Plan testing and maintenance of protection systems.
Who it's for
- Protection engineers.
- Distribution network engineers.
- Protection testing technicians.
- Generation connection engineers.
- Incident analysis specialists.
- Electrical maintenance engineers.
- Engineering or science graduates aiming to move into electricity distribution.
What you'll work with
- IEC 60909-0 (short-circuit currents)
- IEC 60255-151 (functional requirements for overcurrent protection)
- IEC 61869-2 (current transformers)
- Royal Decree 337/2014 (Spanish high-voltage regulation, ITC-RAT 13 earthing)
- Royal Decree 842/2002 (Spanish low-voltage electrotechnical regulations)
- IEEE C37.112 (inverse-time characteristics)
- Royal Decree 1955/2000 (transmission, distribution and quality of service)
- IEEE 1547-2018 (interconnection of distributed resources)
- DIgSILENT PowerFactory
- ETAP
- CYMTCC
- Omicron Test Universe
- MATLAB/Simulink
12 modules · 1900 h
1.1Types of faults in medium and low voltage1.2Short-circuit calculation according to IEC 609091.3Contribution of motors and generation1.4Resistive and high-impedance faults1.5Evolving and intermittent faults1.6Fault statistics on overhead networks1.7Thermal and dynamic effects1.8Fault records1.9Incident analysis1.10Case study: analysis of an oscillographic fault record
2.1Isolated neutral2.2Solidly earthed neutral2.3Impedance-earthed neutral2.4Compensated neutral with Petersen coil2.5Neutral earthing in Spanish networks2.6Overvoltages by earthing system2.7Network capacitive currents2.8Personal safety2.9Choice of earthing system2.10Practical exercise: calculation of earth fault currents by earthing system
3.1Current transformers3.2Saturation and protection classes3.3Voltage transformers3.4Core-balance CTs for earth faults3.5Low-power sensors3.6Burden sizing3.7Wiring and polarity3.8Instrument transformer testing3.9Errors and their effect on protection3.10Laboratory: saturation analysis of a current transformer
4.1Functions 50 and 514.2IEC and IEEE curves4.3Directional protection 674.4Feeder settings4.5Protection of distribution transformers4.6Coordination of time-current curves4.7Expulsion and current-limiting fuses4.8Fuse–relay coordination4.9Coordination of cascaded relays4.10Practical exercise: coordination of a feeder with relays and fuses
5.1Protection 50N and 51N5.2Directional earth fault 67N5.3Wattmetric earth fault protection5.4Detection in compensated neutral networks5.5High-impedance faults5.6Transient-based algorithms5.7Restricted earth fault protection5.8Sensitivity and selectivity5.9Testing of earth fault protection5.10Laboratory: setting of wattmetric protection
6.1Reclosers and their logic6.2Reclosing cycles6.3Sectionalisers and their coordination6.4Recloser–fuse coordination6.5Fuse-saving schemes6.6Automatic transfer schemes6.7Fault passage indicators6.8Remote control and restoration6.9Impact on quality of service6.10Case study: reclosing scheme for a rural overhead line
7.1Inverter contribution to faults7.2Protection blinding7.3Sympathetic tripping on feeders7.4Unintentional islanding7.5Anti-islanding protection of generators7.6Connection requirements7.7Fault ride-through7.8Coordination with reclosing7.9Adaptive protection solutions7.10Practical exercise: analysis of blinding caused by photovoltaic generation
8.1Protection of the MV/LV transformer8.2Fuses in MV switchgear8.3LV circuit breakers8.4Selectivity at low voltage8.5Residual current protection8.6Surge protection8.7Earthing installations8.8Step and touch voltages8.9Maintenance of protection8.10Laboratory: calculation of step and touch voltages
9.1Multifunction numerical relays9.2IEC 61850 in distribution9.3Logic schemes using GOOSE9.4Communication-assisted protection9.5Line differential protection9.6Event recording and oscillography9.7Setting groups9.8Settings management9.9Relay cybersecurity9.10Practical exercise: selectivity logic using GOOSE
10.1Protection in island mode10.2Reduced fault currents10.3Adaptive protection in microgrids10.4Microgrid differential protection10.5Voltage-based protection10.6Protection in meshed LV networks10.7Storage and protection10.8Centralised protection schemes10.9Laboratory testing10.10Case study: protection scheme for an industrial microgrid
11.1Coordination studies11.2Calculation tools11.3Relay testing with injection test sets11.4End-to-end testing11.5Analysis of unwanted trips11.6Maintenance of protection11.7Settings audit11.8Settings documentation11.9Performance indicators11.10Workshop: analysis of an unwanted trip
12.1Selection of the study network12.2Short-circuit calculation12.3Neutral earthing and earth faults12.4Coordination study12.5Integration of distributed generation12.6Automation schemes12.7Test plan12.8Conclusions and future work12.9Master's Thesis report12.10Master's Thesis: defence before a panel
How you'll learn
The programme is delivered 100% online on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within each intake, so it can be combined with work.
Each module combines theory, guided reading of the original standard and applied exercises. The working software is DIgSILENT PowerFactory, ETAP, CYMTCC, Omicron Test Universe and MATLAB/Simulink, in free, academic or evaluation versions. Work is based on real procedures for feeder protection coordination studies, relay testing by secondary injection and analysis of fault records. Assessment is continuous by module, plus the final Master's Thesis.
Standards covered: IEC 60909-0, IEC 60255-151, IEC 61869-2, Royal Decree 337/2014, Royal Decree 842/2002, IEEE C37.112, Royal Decree 1955/2000, IEEE 1547-2018.
Build it end to end
Your final project follows the real engineering workflow, step by step, reviewed by your tutor.
Where this takes you
Requirements
- University degree in engineering, science or architecture, or equivalent demonstrable professional experience.
- Internet connection and a computer capable of running the programme software.
- English sufficient to read technical standards.
Ready to start?
Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.
Frequently asked questions
The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.
You work with DIgSILENT PowerFactory, ETAP, CYMTCC, Omicron Test Universe and MATLAB/Simulink, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.
A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.
Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.
A degree in engineering, science or architecture (or equivalent professional experience), a computer able to run the programme software, and English sufficient to read technical standards.
Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.
Related programmes
Master’s in H₂ Infrastructure Engineering
Online master's programme of 1,900 hours in H₂ infrastructure engineering, structured in 12 modules covering materials, compression, storage, pipelines and repurposed gas networks, blending, road and…
Master’s in Financial Structuring Engineering for Energy Projects
Online master's programme of 1,900 hours in financial structuring engineering for energy projects, structured in 12 modules covering project finance, financial modelling, debt sizing, capital structure,…
Master’s in Distribution Engineering, ADMS & Low Voltage
Online master's programme of 1,900 hours in distribution, ADMS and low-voltage engineering. 12 modules covering MV and LV network design, unbalanced network analysis, ADMS and DERMS,…
More in Energy and Networks
All Energy and Networks programmes → · How to apply · Fees & financing · Scholarships