CourseEnergy and Networks Applications open

BESS Utility-Scale Engineering Course

300-hour online course in utility-scale BESS engineering. 6 modules covering IEC 62933 (electrical energy storage systems), UL 9540 (energy storage systems) and HOMER Pro. Dedicated tutor and open enrolment.

Duration300 h
ModeOnline
Start datesSet by the faculty
AwardSEIUM Institute certificate
Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Compare battery technologies and chemistries for large-scale applications.

02

Size the power and energy of a BESS according to its use case.

03

Design the electrical architecture and auxiliary services of the plant.

04

Apply fire safety and separation criteria in site layout.

05

Verify compliance with grid connection requirements.

06

Plan construction, testing and commissioning.

07

Develop the basic design of a utility-scale BESS.

Profile

Who it's for

  • Energy storage engineer who wants to specialise in BESS Utility-Scale Engineering.
  • Plant electrical design engineer who wants to specialise in BESS Utility-Scale Engineering.
  • BESS project manager who wants to specialise in BESS Utility-Scale Engineering.
  • Commissioning engineer who wants to specialise in BESS Utility-Scale Engineering.
  • Grid connection specialist who wants to specialise in BESS Utility-Scale Engineering.
  • Technical adviser for financiers who wants to specialise in BESS Utility-Scale Engineering.
  • Engineering or science graduates looking to enter energy storage.
Standards & tools

What you'll work with

  • IEC 62933 (electrical energy storage systems)
  • UL 9540 (energy storage systems)
  • NFPA 855 (installation of stationary energy storage systems)
  • IEC 62619 (safety of industrial lithium batteries)
  • UL 9540A (test method for thermal runaway propagation)
  • IEC 62477-1 (safety of power converters)
  • Regulation (EU) 2016/631 (requirements for grid connection of generators)
  • UN 38.3 (transport testing of lithium batteries)
Syllabus

6 modules · 300 h

  1. 1.1LFP vs NMC chemistry
  2. 1.2Cells, modules and racks
  3. 1.3Battery management systems
  4. 1.4Containers and integrated skids
  5. 1.5Power conversion systems
  6. 1.6Grid services and use cases
  7. 1.7Power, energy and duration
  8. 1.8Degradation and service life
  9. 1.9Cost trends
  10. 1.10Case study: comparison of integrator offers
  1. 2.1Sizing by use case
  2. 2.2Oversizing for degradation
  3. 2.3AC- and DC-coupled architectures
  4. 2.4Medium-voltage transformers
  5. 2.5Connection substation
  6. 2.6Losses and round-trip efficiency
  7. 2.7Plant auxiliary services
  8. 2.8DC cabling
  9. 2.9Earthing
  10. 2.10Laboratory: energy sizing in Python
  1. 3.1Plant layout
  2. 3.2Foundations and drainage
  3. 3.3Container climate control
  4. 3.4Fire prevention
  5. 3.5Gas ventilation and deflagration
  6. 3.6Separation distances
  7. 3.7Propagation risk between units
  8. 3.8Noise and environment
  9. 3.9Access for fire services
  10. 3.10Practice: siting a 400 MWh BESS
  1. 4.1Connection requirements
  2. 4.2Interconnection studies
  3. 4.3Active and reactive power control
  4. 4.4Frequency response
  5. 4.5Voltage dip behaviour
  6. 4.6Simulation models for the operator
  7. 4.7Conformity testing
  8. 4.8Metering and telemetry
  9. 4.9Access and connection in Spain
  10. 4.10Workshop: verification of grid code requirements
  1. 5.1EPC and supply contracts
  2. 5.2FAT and SAT testing
  3. 5.3Battery commissioning
  4. 5.4Capacity test
  5. 5.5Integration with SCADA and EMS
  6. 5.6Performance guarantees
  7. 5.7Project risk management
  8. 5.8Transport of batteries as dangerous goods
  9. 5.9Final project documentation
  10. 5.10Case study: commissioning plan for a BESS
  1. 6.1Use case and requirements
  2. 6.2Cell technology selection
  3. 6.3Power and energy sizing
  4. 6.4Electrical plant design
  5. 6.5Layout and safety
  6. 6.6Grid code compliance
  7. 6.7Cost estimation
  8. 6.8Construction plan
  9. 6.9Report and presentation
  10. 6.10Final review with the tutor
Methodology, software & labs

How you'll learn

100 % online training on the SEIUM campus, with downloadable material, recorded classes and a dedicated technical tutor. There are no fixed timetables: students progress at their own pace within the intake, which makes it possible to combine study with work.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is HOMER Pro, System Advisor Model (SAM), DIgSILENT PowerFactory, PSCAD, Python, in free, academic or evaluation versions. Assignments are based on real procedures for battery sizing by use case, verification of grid connection requirements, and planning of FAT, SAT and capacity tests. Assessment is continuous, per module, plus the final integrative project.

Accreditable laboratories(EN ISO/IEC 17025) with rotor test rig, EMC/Lightning pre-compliance, HIL/SIL, vibration/acoustics.
Evidence-focused Master's Thesis:safety case, test plan, compliance dossier and operational limits.
Industry mentoring:lecturers with experience in training, , eVTOL/UAM and flight test.
Flexible format(hybrid/online), international cohorts and support from SEIUM Career Services.
Ethics and safety:safety-by-design approach, cyber-OT, DIH and compliance as pillars.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Use case and requirements

Compare battery technologies and chemistries for large-scale applications.

Cell technology selection

Size the power and energy of a BESS according to its use case.

Power and energy sizing

Design the electrical architecture and auxiliary services of the plant.

Electrical plant design

Apply fire safety and separation criteria in site layout.

Layout and safety

Verify compliance with grid connection requirements.

Career opportunities

Where this takes you

Energy storage engineerPlant electrical design engineerBESS project managerCommissioning engineerGrid connection specialistTechnical adviser for financiers
Admissions & scholarships

Requirements

  • No prior degree is required.
  • Internet connection and a computer capable of running the programme's software.
  • Sufficient Spanish to follow technical standards documentation.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme comprises 300 hours in total, spread over 3 to 5 months. That is between 10 and 15 hours a week on average, compatible with a full-time job.

You will work with HOMER Pro, System Advisor Model (SAM), DIgSILENT PowerFactory, PSCAD, Python. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.

An in-house SEIUM diploma on passing the continuous assessment and the integrative project. This is in-house training, not an official qualification from the Ministry.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised towards the higher programme. Check the recognition policy when you enrol.

BESS Utility-Scale Engineering CourseEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.